Skip to content
AI Infra Atlas

Timeline

The cloud is older than it looks.

Scrub through a century and a half. The campus below changes with the era, from a raised-floor computer room to a liquid-cooled AI factory.

Neocloud AI compute campusCurrent and emerging

2024

The AI factory as a service.

Building
Modular pods, retrofit shells, rapid expansion modules
Rack density
≈40–150 kW/rack
Cooling
Direct-to-chip liquid
Power
Leased utility capacity, on-site gas turbines or bridging power
Networking
Dedicated per-tenant fabrics or partitioned shared fabrics; dark fiber and carrier diversity
Software
GPU cloud control plane: reservation, scheduling, health checks, tenant isolation
Business model
Reserved clusters and on-demand GPU-hours sold to model builders and enterprises
Bottleneck
GPU allocation, energized power and the speed of capital
Geography
Anywhere with power available quickly: retrofits, colocation, build-to-suit and remote sites
Environment
Speed-to-power can mean on-site fossil generation; choices vary widely by operator

2024Rack-scale, liquid-cooled systems

Liquid cooling

Blackwell-generation racks join 72 GPUs in one NVLink domain at well over 100 kW per rack; direct-to-chip liquid cooling becomes the norm for frontier clusters.

Specifications for Rack-scale, liquid-cooled systems
SystemGB200 NVL72: 72 GPUs, 36 CPUsVendor spec
Rack power≈120–132 kWReported
GPUB200: 208B transistors, TSMC 4NP, 192 GB HBM3eVendor spec

Key components

  • Compute trays
  • NVLink switch trays
  • Copper spine
  • CDUs
  • Cold plates

Inspect in 3D